Concreters in South MacKay, 4740, QLD
Remove existing old patchwork slab and pour a new one. Will be approximately 6 m x 5 m and needs to be whatever thickness sheds pad needs to be in Mackay I suppose. Need...
Remove existing old patchwork slab and pour a new one. Will be approximately 6 m x 5 m and needs to be whatever thickness sheds pad needs to be in Mackay I suppose. Need to work with a plumber to do a rough in for the floor drain and potentially capped off toilet waste. There are some pipes in the way for the pool equipment which will need to be rerouted before the pour. Shed pad will be at the rear of a typical town block 20 x 40 m
The customer's contact details are shared only with the businesses that take the lead.