How long does a bathroom renovation take

15 Oct, 2024 / Bathroom Renovators / Written by ServiceTasker Team / 15 Views / Last Updated 15 Oct, 2024

How long does a bathroom renovation take





By far, one of the best ways to make your home more comfortable and valuable is with a bathroom remodel. Whether you're modernizing old accessories, adding features for better use, or beautifying to make it more like a spa, giving your bathroom an uplift can transform this functioning area of the property. But one of the main questions that comes up when thinking about entering a new project is, “How long will it take?”


A bathroom renovation timeline can swing widely based on several factors, such as the size or scope of work in your existing space, how quickly you would like to move forward with your project, and most notably, the availability of materials and contractors. Recognizing the various phases of a renovation and how long they usually take will assist you in organizing everything very well, without any hurry or last-minute stress. Step by step, we will get you through the process and give you an estimated bathroom renovation timeline.




Bathroom Renovation Preparation Work And Their Timeline


Check specific time frames for each step, but many of these steps can happen at the same time and shorten that amount. When you have just one bathroom in your house, you must consider how to go about toileting and washing during the renovation of the bathroom. Regarding the first, things can get more than a bit anxious that's why it is always an option to use your neighbour's loo or head off to the gym for a shower.


Design and Planning (2–4 weeks)


Firstly, create a vision of the layout you would like to have in your bathroom. Research the bathroom style you want, what budget can match it depending on your interior colour, and how much work needs to be done. Some things to consider during your design and planning phases are:



  • Moodboards: Pinterest is a great place to get design inspiration for your bathroom. Watch for other things as well. If you go to other family or friends' houses, hotels, restaurants, bars, etc., make note of the aspects that appeal most to you.

  • Colours: Look into colour schemes and give thought to what colours you enjoy, and their form, i.e., what two, three, or four colour sets do you like together?

  • Mirrored Cabinets and Vanity Units: Mirrored cabinets and vanity units are both wonderful multi-purpose choices.

  • Reusables: Think about what you don't want to reuse in the bathroom. Are you intending to renovate the whole room, or will you just update the tub, shower, toilet, and other bathroom fixtures while keeping them in their current location?

  • Mobility And Accessibility: The most basic question is to ask who will be using the bathroom. You may want to maintain or install a bath with young children for an easier bathing routine. Also, do more research on mobility and accessibility in the bathroom if you need it!

  • Storage Space: Instead, do you have a large family and need lots of space to store said items? Consider how much storage you need and where your belongings can be stored.

  • Electrical Settings: Another important thing to consider is the electrical system. In addition, I want lighting fixtures, power electric sockets, and electrical for light-up cupboards and the like.


Research is also important during the designing and planning phases to know the permits or planning permissions required by you for your renovation. They may be unnecessary because you could probably do without them, but if your renovation is on a grand scale, you have got to take ventilation and drainage into account.


When you have decided exactly the way that your dream bathroom should look and taken all of these things into account at this point in the project, speak with a designer or builder to start blueprints.



Modern Bathroom Renovation



Research, Scheduling, and Contractor Selection (2-4 weeks)


This includes hiring a good contractor or company, talking about the times they will be able to work, seeing important signs throughout this document on what needs to be done with your project, signing contracts, etc. So that celebration of achievement is well-defined. The total time for your application process is 2–4 weeks. Be sure to check out contractor reviews and references, or better yet, get someone you trust to recommend a good one.



Materials Ordered (3–7 week wait)


Purchase fixtures, tiles, cabinets, and any other materials sufficiently in advance to avoid delays. Allow yourself to consider well-crafted decisions. Don’t rush the process. It takes the stress and worry out of, "Did I receive everything I will ever need on location before starting this project?" It is also worth enquiring with your local bathroom showroom, as most will happily provide you with samples, which can be incredibly helpful in making decisions on layout and if colours work practically.



Old Fixtures Removed and Prep Work (1-2 weeks)


As required, the uninstallation of all current fixtures and fittings, tiles, etc. Make any required plumbing and electrical repairs or upgrades. They had the installation completed in a few days, and I'm sure we could have ours done within two weeks (again dependent on job size, as they said); that's the removal of any existing fittings or parts that need to stay. Make it at least one week in case things get delayed.



So, preparations for bathroom renovations can vary from about 4 weeks to around eight weeks, depending on how soon you want the renovation and the size of the project. Keep in mind that many of the steps above can be accomplished simultaneously, not as slowly as it seems, this makes things fast and easy.




How long does it take to renovate a bathroom?


All the above preparation must be complete before you can prepare for renovation. Depending on the size of your bathroom and how extensive it will be, a primary groove can take one to two days or more. So do keep in mind that it may take longer than the norm to complete your project.



Please note that these timeframes are general references, and the project may take longer or could even be ready sooner. A bathroom remodel that takes only two weeks sounds ideal, but others take a month or more to come up with the final result. Here is how you can break it all down for bathrooms of varying sizes.




Small Bathroom (1-2 weeks)


Plumbing and Electrical work: 2-4 days

For changes on the lesser end that do not involve everything being kept where it is, such as relocating the toilet, shower, or sink, they can be done in a single day. In those cases, the process might take up to four days for something more substantial.



New bathroom fixtures and finishes:3 to 4 days to install.




Large Bathrooms (2–3 weeks)



  • Plumbing and electrical work: 4-5 days

  • Fixtures and finishes: 7–10 days




Larger Bathrooms (3–4 weeks)



  • Electrics and plumbing: 6-7 days

  • Hang fixtures and finish: 10 to 14 days




Typical Time To Plan And Install An Entire Bathroom From Scratch


Naturally, a full bathroom renovation—once the design has been finalized and the construction phase begins—can last anywhere from 1-3 months, with smaller bathrooms or ensuites falling at around half that timeframe. It takes longer for big bathrooms, to complete demolition and renovation.


Here's a rough timeline for a full bathroom renovation:

  • Design and Planning: 2–4 weeks

  • Scheduling and Contractor Selection: 2-4 Weeks

  • Ordering Materials: 1-2 weeks

  • Removal and Preparation: 1-2 Weeks

  • Plumbing/Electrics: 0.5-2 weeks

  • Putting in fixtures and finishes: 0.5-2 weeks


Remember, unforeseen problems or changes to the scope of your project can take time and require flexibility and open communication with your contractor.




Bathroom Renovation Service




Why can a bathroom renovation take longer than expected?


Completing a bathroom renovation on the same timeline as you first hoped and planned is probably not achievable in nearly all cases. Chances are there might be a few delays, so here is what can delay your bathroom renovation.



  • Unforeseen Issues: In the removal process, problems include hidden plumbing and wiring issues, water damage, or structural weaknesses in workers. Working on sorting out and resolving these will stretch the timeline.

  • Permits and Inspections: The only note is that you need to get your electrical work signed off, but that's all on the electrician. For a large-scale renovation, including changing drainage or adding in bathroom spaces during, for example, loft conversions into habitable rooms (or if you plan on extending), planning permission may be required. However, for the most part, you should not have to.

  • Contractor Availability: Scheduling constraints, sudden illness, or the unavailability of contractors or subcontractors can result in delays due to how busy the construction industry is.

  • Investigation: A reliable plumber will take care of several other sources as they appear, for example, zillion cleaning or drain solutions. This is not only a cost-effective way of completing the job but also hassle-free because you don't have to make all the juggling and scheduling tradesman arrangements yourself. The price they quote usually covers all work, including tiling and electrical.

  • Availability of Materials: Now that we are reeling from this supply chain shortage, you cannot do as much to guarantee your materials will not be late. You can also expect longer shipping times on imported tiles and fixtures.

  • TIP: You might want to plan and order a few months in advance so you can be certain they will show up before your renovation begins.

  • Customisation: Projects that include custom materials, fixtures, or cabinetry will experience delays in production and delivery of items. Ensure you get these ducks in a row with as much time before closing as possible to avoid any train wrecks.




Ways That You Can Minimize Delays in Your Bathroom Renovation


Now that you know where there could potentially be delays, here are some strategies to help prevent them:



  • Thorough Planning: Begin with a well-crafted plan that clearly outlines the scope of work, materials, and timeline. Get a professional designer or contractor involved in the planning of this.

  • Stick to the plan: When you make a plan, follow it. Going off the plan hurts you both in terms of time and money.

  • Clear Communication: Always be open and honest with your contractors and subcontractors. They are make-or-break for most agencies, so treat them as well! Keep constant communication on the project's progress, any worries that come up, and requirements.

  • Contingency Planning: Give yourself some time to rest when planning your project timeline. A reasonable buffer allows for unavoidable issues without overtaxing your response to them.

  • Quality Contractors: It reduces delays caused by mistakes or mismanagement when hiring a reputable and experienced contractor. Don't forget to read the references to reviews before choosing it.

  • Client Responsibilities: Those include: Homeowners must be ready to make decisions on design and materials/fixtures promptly. In doing so, we help avoid delays that arise when problems and questions are not immediately addressed.

  • Check the weather: Just one qualification: if the redesign is on the exterior of a house, double-check that it is not going to rain and get your project wet. Remember, you need to have inclement weather days built into your schedule and be prepared to adjust.

  • Manage Expectations: Accept that, despite the intricate planning, some delays will crop up. Help yourself keep calm along the way by preparing to deal with this.

  • Temporary Accommodations: If your bathroom is the only one in town, plan for temporary solutions (a port-a-potty or borrowing a neighbour's loo) while you renovate.




Conclusion


A bathroom renovation is a massive undertaking, and quite frankly, prospective homeowners would be wise to know just how long it can take. This whole process will usually take between 4 and 8 weeks to complete, depending on the size and complexity of your project, but you can expect a beautiful, newly designed space that is functional and aesthetically pleasing.


When you understand the major phases of a renovation- planning and design, permitting, demolition, plumbing/electrical/HVAC work (rough-in phase), tiling (if applicable), fixture installation/painting, flooring/built-ins (second-fix building components), and final inspections—you can plan on how long each will take. This way, you can forge realistic expectations and ensure the project runs smoothly in general.


In the end, spending time and effort on a bathroom renovation executed by professionals is incredibly worth it. What you get is a stunning, efficient room that provides for your family and even raises the value of your household as a whole. When planned well and constructed correctly, your dream bathroom should never elude you.





Get free quotes Register Business

YOU MIGHT ALSO BE INTERESTED IN

Bathroom Renovation Checklist
Admin
Wed, 7, Feb 438

Bathroom Renovation Checklist

Bathroom Renovators
How to Remodel Your Bathroom?
Admin
Wed, 18, Sep 93

How to Remodel Your Bathroom?

Bathroom Renovators
Best Bathroom Plants to Enhance Beauty and Air Quality
Admin
Wed, 18, Sep 83

Best Bathroom Plants to Enhance Beauty and Air Quality

Bathroom Renovators

Bathroom Renovators Related Categories

Download the ServiceTaskerTM App Now

For a seamless and user-friendly interface, you can download our official app available for both Android and iOS users. Get more features in the app.

Categories Get free quotes Login Register Business